Russell Construction’s long relationship with Castleton State College began in the 1980s, when we were tasked with building a new gymnasium on campus, as well as constructing additions to the school’s library.

Two decades later, in 2003, Russell was back at Castleton renovating Woodruff and
Leavenworth Halls. Russell worked diligently with the faculty and staff to
minimize disruptions during the renovations.

In 2005, Russell was awarded the design/build contract for 3 new student residence buildings that will provide living and common space for 108 students. These residences included amenities such as living, laundry, and food prep areas, as well as a an outdoor patio overlooking a trout pond.

in 2006, Russell was back at the college performing renovations at the
Gymnasium and the Fine Arts Center.

Five years later, in 2011, we returned once again to perform interior office renovations and window replacements at Leavenworth Hall.

The Vermont Veteran’s Home

Renovation of the Vermont Veteran's Home in Bennington, Vermont

Client:  The Vermont Veteran’s Home
Location: Bennington, VT
Project:  Extensive Renovation of the Vermont Veteran’s Home

This project consisted of a complete renovation of the existing North Wing and mechanical upgrades and minor renovation work to the existing A Wing, including some Mold and Asbestos removal.
The 14,000 square foot renovated North Wing layout includes 23 new patient rooms, residents lounge, nurses station, treatment room, activities room and congregate bathing. The work included all new plumbing and HVAC which incorporates the existing Geothermal system, new electrical work, nurse call system, fire protection and all new window, doors and finishes. The exterior walls were upgraded with brick veneer and EIFS system, increasing the insulation values of the building and producing a complete thermal building envelope. Also included in the scope of the work were exterior site upgrades and landscaping. This project was done in phases while the facility remained fully operational.